Our Work
Projects our team has been involved in
From IoT deployments and energy management to large-scale sustainable infrastructure. Real results across industry, commercial buildings, public sector, and international development.
Many projects below showcase the experience our team members brought to Lumina 360 from their previous roles in engineering and sustainable development. Lumina 360 projects are marked with a teal badge.

Castlepollard, Ireland
Mergon International Initial Lumina+ Deployment
Mergon Group
52 monitoring points across two plants
Mergon Group's Castlepollard facility had around 30 energy meters from a legacy monitoring system that had been discontinued. The hardware was sound but stranded: no communication, no platform. Lumina's solution was to integrate all of it wirelessly via LoRaWAN, avoiding a full rewiring, and bring it into Lumina+ along with the historical data.
- ~30 legacy meters integrated via LoRaWAN: no rewiring, no hardware replacement
- Total site electricity monitored across both plants to within 1% of utility bills
- Sensors added progressively over time to address new operational requirements
- Vibration sensor PoC deployed on rotating machinery with ML anomaly detection

South Carolina, USA
Complete IoT & Energy Monitoring Solution
Mergon Group
33 assets monitored across electrical, vibration, and process circuits
Thirty-three assets across blow moulding, injection moulding, chillers, compressors, and dust collectors monitored in real time across electrical, vibration, and process monitoring. The Lumina+ platform is embedded in the team's daily operations.
- 33 assets monitored: blow moulding, injection moulding, chillers, compressors, and dust collectors
- Real-time email alerts when monitored parameters go out of bounds
- Open REST API: Mergon feeds Lumina+ data directly into their internal production systems
- Vibration monitoring deployed on rotational machinery as a proof of concept for predictive maintenance

United Kingdom & Maryland, USA
Waste-to-Energy CHP Projects
Biomass District Heating
3.6 MW thermal, 280 kWe via ORC plant
Innovative biomass district heating projects utilising chicken litter as fuel for boilers to generate electricity via CHP technologies, with residual heat warming poultry sheds.
- 600 kW – 1 MW biomass boiler applications
- 50–90 kW electrical generation via steam expander
- >90 kWe ORC plant for medium/high temperature
- Dense ash high in P&K, valuable for fertiliser industry

Riyadh, Saudi Arabia
320-Apartment Complex: MEP & Sustainability Design
Residential Development Riyadh
320 apartments, 160,000 m² total site area
Project Technical Director and Head of Sustainability for the design of a complex of 320 three-bed apartments with Capital Mosque, local mosque, supermarket and recreational areas.
- 320 three-bed apartments across 4–7 storeys
- 120,000 m² gross floor area
- Podium and basement car-parking design
- External recreational areas and amenities

North of Riyadh, Saudi Arabia
Category 3 Viral Containment Facility
Research Facility
5,500 m² specialist Category 3 research site
MEP services design for a new Category 3 viral containment facility incorporating specialist variable volume ventilation, specialist gases, sterilisation and drainage systems.
- Category 2 & 3 laboratory design
- Transgenic core labs for genetic engineering
- Variable volume ventilation linked to lab loading
- Critical pressure regimes for full containment

Baku, Azerbaijan
7,000 Hectare Economic Development: MEP Infrastructure
Alat Free Economic Zone
7,000 ha site, first phase opened July 2022
MEP and sustainable design for the AFEZ (Alat Free Economic Zone), a major 7,000 hectare development set to play a significant role in the economic growth of Azerbaijan.
- Master planning for entire 7,000 ha site
- 10,000 m² office building for FEZ authorities
- Lettable space for FEZ tenants
- First phase opened July 2022

King Abdullah Economic City, Saudi Arabia
3.6M m² Economic Zone: MEP Infrastructure
Bonded & Re-Export Zone
89 MVA electrical supply across a 3.6 million m² development
MEP masterplanning and infrastructure design for 1 million m² of commercial and industrial buildings within the new King Abdullah Economic City and port.
- 3.6 million m² total site area
- 1 million m² of industrial and commercial buildings
- 89 MVA HV/MV electrical supply across the full site
- Primary and secondary road networks and infrastructure

Al Uyaynah, Riyadh, Saudi Arabia
2.4M m² Mixed-Use Masterplan: MEP Design
Solar City Riyadh
2.4 million m² site, 500,000+ m² of buildings
MEP Director and Head of Sustainability for a 2.4 million m² masterplanned site including research, housing, commercial, leisure, and manufacturing facilities.
- Research buildings and manufacturing facilities
- Housing, commercial and leisure facilities
- Institutional and utility buildings
- Full mechanical and electrical infrastructure design

Dublin, Ireland
National Aquatic Centre: IoT Condition Based Monitoring
Sport Ireland Campus
FM Project of the Year (Public Sector), FM Awards 2026
Wireless IoT condition monitoring and predictive maintenance system across 38 key-risk points at the National Aquatic Centre, detecting equipment faults before failure, with zero shutdowns during installation. Winner of FM Project of the Year (Public Sector) at the FM Awards 2026.
- 38 wireless IoT monitoring points across pumps, boilers, AHUs, expansion vessels, and booster sets
- FM Project of the Year (Public Sector), FM Awards 2026
- Boiler fault detected within weeks of go-live, preventing full heating loss
- Non-intrusive deployment: zero shutdowns, zero rewiring

Cork, Ireland
Cork City Hall IGDR
Cork City Council
56% energy reduction opportunity identified
Investment Grade Decarbonisation Report for Cork City Hall, a 29,600 m² civic complex consuming 3.37 million kWh annually. Lumina delivered a costed, grant-mapped 17-measure roadmap identifying 56% energy and 55% CO₂ reduction opportunities.
- 56% energy reduction opportunity across 17 measures
- €134k+ potential annual savings identified
- Full grant mapping: SEAI EEOS, Business Energy Upgrades, Microgen
- Two-stage decarbonisation pathway with IRR, NPV, and payback per measure

Cork, Ireland
Cork Public Museum IGDR
Cork City Council
75% potential energy cost reduction identified
Investment Grade Decarbonisation Report for Cork Public Museum, a 1,909 m² protected heritage building in Fitzgerald Park. Lumina identified a costed, grant-mapped roadmap with potential for 75% energy cost reduction and 52% CO₂ savings.
- 75% potential energy cost reduction identified
- 51% energy consumption reduction, 52% CO₂ reduction in Stage 1
- Full grant mapping: SEAI EEOS, Business Energy Upgrades, Microgen
- Wireless sub-metering with Lumina+ monitoring included in the roadmap

Cork, Ireland
Cork City Hall Phase 1 Energy Metering
Cork City Council
Nearly €25,000/year in savings opportunities identified in the first weeks of operation
Phase 1 energy sub-metering system across Cork City Hall and Civic Offices: electricity, gas, and heat. Within the first weeks of go-live, Lumina identified nearly €25,000 per year in clear, actionable savings opportunities.
- Nearly €25,000/year in savings opportunities identified within weeks of go-live
- Continuous heating in Old Boiler House: €10,080/year opportunity identified
- AHU 3 operating at constant load for intermittently occupied tenant offices: €7,078/year
- Metering data validated IGDR assumptions, de-risking the planned capital programme

Douglas, Cork, Ireland
Gus Healy Pool IGDR
Cork City Council
64% potential energy reduction identified
Investment Grade Decarbonisation Report for Gus Healy Swimming Pool in Douglas, Cork. Lumina identified a costed, grant-mapped Stage 1 programme with 64% energy reduction potential and a 4.1-year payback, led by pool pump optimisation, AHU heat recovery, and solar PV.
- 64% potential energy reduction and 62% CO2 reduction across the full programme
- Pool pump VSD reprogramming: 0.7-year payback, 123% IRR, minimal capital required
- AHU heat recovery non-functional: largest single carbon-reduction opportunity on site
- Stage 1 adjusted payback 4.1 years with substantial SEAI grant support available

Dublin, Ireland
Elm Park IGDR: Carbon Roadmap for Dublin HQ
Allianz
Full Investment Grade Decarbonisation Report
Investment Grade Decarbonisation Report for Allianz's Irish headquarters at Elm Park, Dublin 4. Lumina delivered a detailed engineering survey and costed decarbonisation roadmap, defining a clear electrification pathway for the building's remaining fossil fuel demand.
- Passively designed building: double-skin facade, thermal mass, automated natural ventilation
- Full engineering audit of all mechanical, electrical, and building services systems
- Staged roadmap: demand reduction and system restoration before new technology investment
- Full grant mapping and financial modelling for each measure

London, UK
Retail Sales & Servicing Facility: M&E Design
Tesla Masthead
Delivered in 9 weeks from initial design to handover
Mechanical and electrical design development for a Design & Build contract for the Tesla retail and servicing facility at Masthead, London, including an interactive car customisation area.
- Full M&E design completed in 9 weeks
- Design & Build contract from initial design to handover
- Interactive car customisation area
- Retail sales and servicing facility